Browse Items (157 total)

  • Collection: Institution Building

https://www.ncbs.res.in/ncbs25/omeka/files/original/d0da1e6f3e4895d3c3b55ff896c39eff.mp3
Raj Rewal, architect of the first phase of NCBS: Perspective on 'rasa' in architecture and his view of designing buildings for science.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/0108fa3dda2558a9f7271a3572035a7e.mp3
UB Poornima, chief architect at NCBS: On the philosophy guiding architectural design.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/3b736e91e7cb4974f2bd6a858e5c4cae.mp3
UB Poornima, chief architect at NCBS: Memories of the design changes on the library wall (now Simons Centre at NCBS), conversations between Raj Rewal and Obaid Siddiqi, and follow-up effects.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/e79747db9fd7a755d6f62d0cb1109d44.mp3
Shobhona Sharma, former student and current faculty member, TIFR: Memories of working with Obaid Siddiqi on building new lab spaces at TIFR.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/a0bbe302ac1494e1024b35c9a55f6f28.mp3
Obaid Siddiqi, founding member of NCBS & TIFR's molecular biology unit: The early ideology behind setting up NCBS in Bangalore

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/90c0d430aa099ef01387b8c52ade2e01.mp3
Govind Swarup, former faculty member at TIFR: Recounting a story of a TIFR Council Meeting where JRD Tata advocated the setting up of many national centres under TIFR.

https://www.ncbs.res.in/ncbs25/omeka/files/original/c8bd91ecfb3f0c072b95414a3a292612.mp3
Vidita Vaidya, faculty member at TIFR: Weighing in on the perception of NCBS as a rule breaker -- looking at the broader good rather than being bogged down by details

https://www.ncbs.res.in/ncbs25/omeka/files/original/f764599d45297d71c5746c189a9cba5a.mp3
Shobhona Sharma, former student and current faculty member, TIFR: The story behind TIFR's Department of Biological Sciences seeking more space with a new building at TIFR (c 1998-2014), and the roadblocks along the way.

https://www.ncbs.res.in/ncbs25/omeka/files/original/b4870c578a83cde452f8601c69331589.mp3
PP Ranjith, early hire as lab manager at NCBS: On building an efficient administrative process in the lab and working within the rules.

https://www.ncbs.res.in/ncbs25/omeka/files/original/a4a2e27b8128e4c46d034d3a1f3b3313.mp3
Sudhanshu Jha, ex director of TIFR: On Homi Bhabha's administrative skills and the need to follow rules and process as an institution scales.

https://www.ncbs.res.in/ncbs25/omeka/files/original/edaa58277fd5b414403bc1a726b4612a.mp3
Krishanu Ray, faculty member and former PhD student at TIFR: On the idea of autonomy for research, with a comparison of TIFR's Department of Biological Sciences and NCBS.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/c005138e73f04c08d4539c3958536438.mp3
Man Mohan Johri, retired faculty member from TIFR: Reflections on the start of NCBS, the conversations at the molecular biology unit and figuring out whether one makes the move to Bangalore.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/98f8c42ec9bb3cf531fc3e5c30544a89.mp3
Obaid Siddiqi, founding member of NCBS & TIFR's molecular biology unit: Reflections on the role and limitations of a director of an institute

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/61be31c474e64d3c08037a2f2538b01e.mp3
Virendra Singh, former director of TIFR: On the need for NCBS autonomy and yet defining the link to TIFR.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/37e58285180416a32cde2d76ad827402.mp3
Vidyanand Nanjundiah, faculty member at TIFR in 1980s: Reflecting on the role of H Sharat Chandra in early negotiations for NCBS to get space in Bangalore

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/a0286a9ef74fddc3f03116f359e2a193.mp3
Jayant Udgaonkar, faculty member at NCBS: On writing an angry letter to the then director of TIFR, after facing many delays in the setup of NCBS

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/b3f0b675d664333652ed27e89020597b.mp3
TM Sahadevan, long-time administrative architect at NCBS: Memories of the late 1980s period when NCBS was being offered land in Maharashtra while struggling to find land in Karnataka.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/d3e97173c4b118548e5f812d5aab131c.mp3
BV Sreekantan, former director of TIFR: Reflecting on the search for land in Bangalore for NCBS, c 1987.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/4444e9b54c1e994ce336432b0ccc0565.mp3
K VijayRaghavan, faculty member at NCBS: Recounting the wading through bureaucracy in the late 1980s, and the different attitudes of the early NCBS faculty.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/506562d2993f8720306fb08a3ae7dc1d.mp3
CNR Rao, National Research Professor at JNCASR and former director, IISc: On the nature of scientific collaborations in the country.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/6e15a83ae458f591766bc31de5980e3f.mp3
TM Sahadevan, long-time administrative architect at NCBS: First meeting with Obaid Siddiqi at the TIFR Centre, IISc, in the mid 1980s.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/74d785b1f3dd58e0708c75cb0d46232d.mp3
BV Sreekantan, former director of TIFR: The 1985 negotiations with the Planning Commission to set up national centres under TIFR to justify the scope of proposed programmes, including NCBS and GMRT.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/91078bc178a4a8979c81b65216928d3a.jpg
Initially conceived master plan of the NCBS campus by Raj Rewal Associates, c 1993.

https://www.ncbs.res.in/ncbs25/omeka/files/original/81363d073d6c6712633fd9c005df8b0f.jpg
Barren land on the University of Agricultural Sciences (UAS) campus, leveled prior to the construction of NCBS, c 1994.

https://www.ncbs.res.in/ncbs25/omeka/files/original/cb4ad08ea014b994c301e3853c43757f.jpg
Obaid Siddiqi's copy of a 1988 issue of "Indian Architect" Magazine featuring a cover story on Raj Rewal's design of the National Institute of Immunology, New Delhi.

https://www.ncbs.res.in/ncbs25/omeka/files/original/b0b5b5f588b000849ba276524f63efcf.jpg
Obaid Siddiqi's reply to an office memo at TIFR about the building of a compound wall in July 1991 to define the boundaries for the new NCBS.

https://www.ncbs.res.in/ncbs25/omeka/files/original/eca9b9fca6fde1fab61a3565dea81760.jpg
A committee report from 1992 on the selection of an external architect for the design of NCBS, with details on Raj Rewal's previous work on the National Institute of Immunology, New Delhi.

https://www.ncbs.res.in/ncbs25/omeka/files/original/383299617beef3204822937c702a67a6.jpg
A committee report from 1992 on the selection of an external architect for the design of NCBS, with details on Raj Rewal's previous work on the National Institute of Immunology, New Delhi.

https://www.ncbs.res.in/ncbs25/omeka/files/original/02104c24d29f892ebb7665821ac1c427.jpg
NCBS hired RD John, a retired Department of Space engineer, as an external advisor for the NCBS construction. Here, RD John relays to Obaid Siddiqi the delay in getting water to the construction site and the need for the construction agency to have…

https://www.ncbs.res.in/ncbs25/omeka/files/original/1610cd1817b2b693469de49d0a72c096.jpg
The initial project design proposal for NCBS, sent in by Raj Rewal Associates.

https://www.ncbs.res.in/ncbs25/omeka/files/original/fb237d2c6f717c9880f1e7272b983116.jpg
The initial project design proposal for NCBS, sent in by Raj Rewal Associates.

https://www.ncbs.res.in/ncbs25/omeka/files/original/8debb270f089791fe09c086f1e7c1faa.jpg
The initial project design proposal for NCBS, sent in by Raj Rewal Associates.

https://www.ncbs.res.in/ncbs25/omeka/files/original/014e00082960eba5a15949c6e21cde88.jpg
The initial project design proposal for NCBS, sent in by Raj Rewal Associates.

https://www.ncbs.res.in/ncbs25/omeka/files/original/8b6201960fb9af5f65ee0bf94ad4ff85.jpg
The initial project design proposal for NCBS, sent in by Raj Rewal Associates.

https://www.ncbs.res.in/ncbs25/omeka/files/original/8dea54820c9e69c05ed8f90df79ce1f9.jpg
The initial project design proposal for NCBS, sent in by Raj Rewal Associates.

https://www.ncbs.res.in/ncbs25/omeka/files/original/a961ac5129f49bef224960ec2ee21564.jpg
The initial project design proposal for NCBS, sent in by Raj Rewal Associates.

https://www.ncbs.res.in/ncbs25/omeka/files/original/f4fba23b60f9093c9bc9219b976f4510.jpg
The initial project design proposal for NCBS, sent in by Raj Rewal Associates.

https://www.ncbs.res.in/ncbs25/omeka/files/original/1f08096a08eeab9537a20d19e07bda9c.jpg
The initial project design proposal for NCBS, sent in by Raj Rewal Associates.

https://www.ncbs.res.in/ncbs25/omeka/files/original/2a65c06dcec2b484047b00d8b53870b9.jpg
Although the DAE had an architect division, the initial crew for NCBS insisted that the new institute should hire an external architect who had experience with laboratory space design. TIFR Council Meeting Minutes from early 1992 where the Council…

https://www.ncbs.res.in/ncbs25/omeka/files/original/acc811946130d3d17c96819e2670b3a9.jpg
Although the DAE had an architect division, the initial crew for NCBS insisted that the new institute should hire an external architect who had experience with laboratory space design. TIFR Council Meeting Minutes from early 1992 where the Council…

https://www.ncbs.res.in/ncbs25/omeka/files/original/a4624b9ecead06d1e348d8424c244e54.jpg
While NCBS was being built, the early faculty continued to work at the TIFR Centre on the IISc Campus, and needed more lab space. The DAE sanctioned money for this additional construction effort in January 1992.

https://www.ncbs.res.in/ncbs25/omeka/files/original/29526eee922121f5a8c87226e667706e.jpg
Raj Rewal's acceptance letter for an offer to be the architect for the design of NCBS. May 1993.

https://www.ncbs.res.in/ncbs25/omeka/files/original/91579b42668d7cf8908f42d3b30f42ad.jpg
In April 1993, the Project Management Committee of NCBS approved the hiring of Raj Rewal for the NCBS design, based upon the assessment of a 1992 committee that evaluated the work of five external architects.

https://www.ncbs.res.in/ncbs25/omeka/files/original/15866cbebd1f7155122d80c63c6d4714.jpg
First floor plan of the TIFR Centre, Bangalore, in 1995. While NCBS was being built, the early faculty continued to work at the TIFR Centre on the IISc Campus.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/5e1fcb914fc5a5a8364e291aa34c08f2.jpg
Early in the project, NCBS hired an external architect, Raj Rewal, to design the campus. It also hired U.B. Poornima, a local architect, to interface between Raj Rewal Associates, the DAE and the NCBS faculty. Her role would prove to be critical as…

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/6be9199ed4d618ba2b1cb77da6bdf917.jpg
Early designs of laboratory space for the founding members of the NCBS Faculty. This image shows the design for MK Mathew's laboratory in 1995.

https://www.ncbs.res.in/ncbs25/omeka/files/original/f0b7967f3fa37d086aa7e07b74a28881.jpg
NCBS construction in process. View overlooking the plantation.

https://www.ncbs.res.in/ncbs25/omeka/files/original/0fc623f47f249f055966b26ffd1d3bf6.jpg
Every month, TM Sahadevan, an administrative officer at NCBS, would send a report to TIFR with an update of the construction process. The reports would include pasted photographs of the site. By 1997, they switched to digital prints.

https://www.ncbs.res.in/ncbs25/omeka/files/original/45cea4abb29531b74bc4dbf51de913aa.jpg
Every month, TM Sahadevan, an administrative officer at NCBS, would send a report to TIFR with an update of the construction process. The reports would include pasted photographs of the site. By 1997, they switched to digital prints.

Tags:

https://www.ncbs.res.in/ncbs25/omeka/files/original/0bb9305da23dc85f9c2b19c0ac79678e.jpg
Every month, TM Sahadevan, an administrative officer at NCBS, would send a report to TIFR with an update of the construction process. The reports would include pasted photographs of the site. By 1997, they switched to digital prints.