Browse Items (1 total)

  • Tags: 3-Scaling-PS1-4

https://www.ncbs.res.in/ncbs25/omeka/files/original/6888800c37484da012a856072cc7bb11.jpg
The 1990 NCBS proposal summarizes the total cost of the new Centre to be 18 crores. By 1996, that figure went up to 33 crores, and then to 35.83 crores in 1999.